Gallery

US 41/IH 43 Interchange (Northbound IH 43 to Northbound US 41 Ramp)

Print

Project Details

Location

Howard, Brown County, WI, United States

Type of Structure

2,200-ft (671-meters) overpass (10 spans)

Year(s) of Manufacture

2013 - 2014

Bridge Opening

Expected in 2017

General Contractor

Wiconsin Department of Transportation

Engineering Firm

URS

Owner

Wiconsin Department of Transportation

Products and Services

Fabrication of the steel bridge superstructure (3,070 tons)

36 box girders

Longest girder: 124-ft. (38 meters)

Girders weight: between 70 and 97 tons each

Description

Construction of an overpass in the scope of the US 41 Project in Howard, Wisconsin.

canambridges.com

RELATED PROJECTSAll projects

To top