Montreal, QC, Canada
394-ft. (120-m) cable-stayed overpass (2 spans)
2014-2018
2018
DB-AECON Pont St-Jacques S.E.P.
CIMA / SNC-Lavalin Joint Venture
Quebec Ministry of Transportation
Fabrication of the steel bridge superstructure (2,100 tons)
Goodco Z-Tech:
2 seismic isolators
8 bearings
167 ft. (51 m) of LG-3 finger plate deck joints
Reconstruction of the Saint-Jacques street overpass spanning over the Décarie Highway (A-15) in Montreal.
Use of a combination of box girders paired with an orthotropic steel deck
canambridges.com