Edmonton, AB, Canada
14 highway bridges
2012-2015
Expected in 2016
Flatiron-Dragados-Aecon-Lafarge, Joint Venture
Buckland & Taylor Ltd.
Alberta Ministry of Transportation
Fabrication of steel components for 14 bridges in joint venture with Rapid-Span Structures Ltd. (14,000 tons)
Goodco Z-Tech:
1,155 structural bearings
3,795 ft. (1,157 m) finger and Series 1000 expansion joints for the construction of 46 bridges
Fabrication of 14 steel highway bridges, including two major 1,056-ft (322-m) structures across the North Saskatchewan River in the scope of the Northeast Anthony Henday Drive project, part of the Edmonton Ring Road in Alberta.
canambridges.com