Township of Nipigon, ON, Canada
820-ft. (250-m) highway bridge (2 spans)
2014 -2016
Expected in 2017
Bot Ferrovial Nipigon Joint Venture (BFNJV)
McCormick Rankin, a member of MMM Group
Ontario Ministry of Transportation
Fabrication of the steel bridge superstructure (2,000 tons)
66 girders
Longest girder: 53 ft. (16 m)
Heaviest girder: 25 tons
Metallizing
Stay cable anchorage
Installation of the bridge, including the prefabricated concrete slabs
Construction of a cable-stayed bridge over the Nipigon River, running parallel to the Highway 11/17 corridor east of Thunder Bay, Ontario.
First cable-stayed bridge ever built in the province of Ontario. Third cable-stayed bridge with continuous plate girders for which Canam-Bridges supplied the components.
canambridges.com