Gallery

Moses Wheeler Bridge

Print

Project Details

Location

Milford, CT, United States

Type of Structure

3,000-ft. (914-meters) highway bridge (14 spans)

Year(s) of Manufacture

2012-2013

Bridge Opening

Expected in 2017

General Contractor

Joint venture between Walsh Construction Company and PCL Constructor's Inc.

Engineering Firm

STV Inc.

Owner

Connecticut Department of Transporation

Products and Services

Fabrication of the steel bridge superstructure (11,900 tons)

398 girders

Longest girder: 126 ft. (38.4 m)

Heaviest girder: 45 tons

Description

Replacement and expansion of the Moses Wheeler Bridge over the Housatonic River between the cities of Milford and Stratford, Connecticut.

Features

The Moses Wheeler Bridge is one of the longest and most heavily traveled bridges in the state of Connecticut.

canambridges.com

RELATED PROJECTSAll projects

To top