Milton, NS, Canada
240-ft. (73-m) highway bridge (single span)
2015
2016
Nova Scotia Transportation and Infrastructure Renewal (NSTIR)
Fabrication of the steel bridge superstructure (270 tons)
Lateral trusses with top bracings
Goodco Z-Tech :
2 Series 1000 expansion joints
4 pot bearings
Design-build
Erection by launching
Longest girder: 40 ft (12 m)
Replacement of the Milton Bridge spanning over the Mersey River in Nova Scotia.
This is the first standard truss bridge designed and fabricated by Canam-Bridges. The steel was galvanized. Sidewalks and PL-2 type guardrails were added.
canambridges.com