Gallery

Madeleine-Parent Bridge (Highway 30)

Print

Project Details

Location

Beauharnois, QC, Canada

Type of Structure

9,840-ft. (3,000 meters) highway bridge (1 bridge in each direction)

Year(s) of Manufacture

2011-2012

Bridge Opening

2012

General Contractor

Nouvelle Autoroute 30 CJV

Engineering Firm

Arup

Owner

Quebec Ministry of Transportation

Products and Services

Fabrication of the bridge superstructure (17,000 tons)

80 box girders

Longest girder: 137 ft. (41.8 meters)

Heaviest girder: 300 tons

Description

Fabrication of 17,000 tons of steel components for two 3,281-foot (1.5 km) structures that are part of the 6,562-foot (2.5 km) bridge built across the St. Lawrence Seaway at the Beauharnois Canal.

Features

The size and weight of the steel components was challenging for both fabrication and transportion.

 