Goose Bay, NL, Canada
377-ft. (115-m) temporary truss bridge (single span)
2015-2016
2016
Barnard-Pennecon LP
Norda Stelo
Nalcor Energy
Fabrication of the steel bridge superstructure (750 tons)
Erection by launching
Goodco Z-Tech:
4 pot bearings
Construction of a temporary truss bridge that will be used during the construction of the dam for the Lower Churchill Project (Muskrat Falls) in Goose Bay, Newfoundland and Labrador.
This is the biggest truss bridge launched by Canam-Bridges to date.