Gallery

Île-des-Sœurs Bypass Bridge

Print

Project Details

Location

Montreal/Île-des-Soeurs, QC, Canada

Type of Structure

541-ft (165-meters) causeway and 148-ft (45 –meters) Viaduct 7

Year(s) of Manufacture

2013 - 2014

Bridge Opening

2014

General Contractor

EBC-Pomerleau

Engineering Firm

Genivar

Owner

The Jacques Cartier and Champlain Bridges Incorporated

Products and Services

Fabrication of 2 steel bridge superstructures (2,300 tons)

50 girders for the causeway and 16 curved girders for the Viaduct 7

Goodco Z-Tech:
36 sliding laminated elastomeric bearings

28 confined elastomeric bearings (pot)

114 meters Series 1000 HSS type expansion joints

Description

Temporary bypass bridge built in the scope of the Île-des-Soeurs Bridge replacement project, which is integrated to the Champlain Bridge corridor.

Features

It is a temporary causeway to limit the impact on traffic during the reconstruction of the Île-des-Soeurs permanent bridge, which will be in the same axis as the current bridge.