Ottawa, ON, Canada
246-ft (75-meters) pedestrian bridge
2014
2014
Louis W. Bray Construction Ltd.
Parsons
City of Ottawa
3 orthotropic steel deck panels
Longest span: 79 feet (24 meters)
Construction of a cable-stayed pedestrian bridge between Hunt Club Pathway and the Southeast Transitway Station in Ottawa, Ontario.
The longest span measures 79 ft. (24 metres). This project involved complex fabrication phases during the assembly and the welding of components.
2015 CISC-Quebec Steel Design Award – “Projects Outside Quebec” Category