Montreal/Laval, QC, Canada
Cable-stayed bridge, 1.2 km (3,937 ft.) long - 12 spans
2010
2011
Kiewit Parsons
Parsons
Concession Autoroute 25 S.E.C.
Fabrication of the steel bridge structure, including 197 girders for the cable-stayed section of the bridge, 8 box girders and 100 girders for the approach section of the bridge (15,000 tons)
Longest girder: 40 m (131 ft.)
The largest pieces are 3.8 m (12 ft.) high and 40 m (131 ft.) long, and weigh 80 tons
Goodco Z-Tech:
Multidirectional elastomeric pot bearings (PM) on piers 10 and 11 of the main span
Wind tongue lateral pinning systems
Assembly of 400 bracings (930 tons)
Goodco Z-Tech provided structural bearings and expansion joints for 10 bridges included in the Highway 25 Bridge project.
Construction of a steel cable-stayed bridge for the completion of Highway 25. The six-lane bridge across the Rivière des Prairies links Montreal to Laval. The main cable-stayed span is approximately 500 m (1,640 ft.) long, and the welded girder approach spans are approximately 680 m (2,231 ft.) long.
Canam-Bridges also fabricated 81 girders for three single-span overpasses for the same project (980 tons).