Hastings, ON, Canada
82-ft. (25-m) highway bridge (single span)
2015-2016
2016
Louis W.Bray Construction Ltd
Associated Engineering Ltd.
Public Works and Government Services Canada
Fabrication of the steel bridge superstructure (200 tons)
2,006 square feet (186 square meters) of orthotropic steel deck
Painting
Erection
Collaboration for the bridge balance
Construction of a new steel swing bridge to replace the existing structure.
The new superstructure required the fabrication of 200 tons of steel components including 2,006 square feet (186 square meters) of orthotropic steel deck. Despite a very tight schedule for the installation of components, the project was completed on time and reopened to road users during the month of April 2016, and gave access to boat navigation on May 15.