Elizabeth, NJ/Staten Island, NY, United States
7,100-ft. (2,165-m) highway bridge
2015-2016
Expected in 2017
Kiewit-Weeks-Massman, AJV (KWM), a joint venture comprised of Kiewit Infrastructure, Weeks Marine and Massman Construction
Parsons
Port Authority of New York and New Jersey
Fabrication of the steel components for the main span, back spans and flanking spans (8,500 tons)
Longest girder: 100 ft. (30 m)
Heaviest girder: 38 tons
72 anchor boxes
Replacement of the Goethals Bridge that spans the Arthur Kill between Elizabeth, New Jersey and Staten Island in New York City.
Fabrication of the steel components for the replacement of the main span with two spans, one eastbound and one westbound, that will measure 1,635 ft. (498 m) and count six lanes in total plus shoulders and a bicycle/pedestrian path. Anchor boxes are installed in the top section of the eight towers.
canambridges.com