Notre-Dame-des-Pins, QC, Canada
1,070-ft. (326-meters) highway bridge (4 spans)
2013
2014
Couillard Construction Ltée
Consortium Roche – Cima +
Quebec Ministry of Transportation
St. Lawrence Erectors
Fabrication of the steel bridge superstructure (4,550 tons)
Longest girder: 118 ft. (36.3 m)
Heaviest girder: 94,000 lbs.
Launched-girder erection
Goodco Z-Tech:
40 pot bearings
8 laminated elastomeric bearings
2 LG-3 type modular expansion joints
2 LG-4 type modular expansion joints
1 HSS type expansion joint (Series 1000)
Construction of a bridge over the Gilbert River and 34th Street in Notre-Dame-des-Pins, Quebec, in the scope of the Highway 73 extension project.
The structure of the Gilbert River bridge is erected 171 ft. (52 meters) high.
Girders were erected using the launching method.