Gallery

Père-Antonio-Poulin Bridge (Gilbert River)

Print

Project Details

Location

Notre-Dame-des-Pins, QC, Canada

Type of Structure

1,070-ft. (326-meters) highway bridge (4 spans)

Year(s) of Manufacture

2013

Bridge Opening

2014

General Contractor

Couillard Construction Ltée

Engineering Firm

Consortium Roche – Cima +

Owner

Quebec Ministry of Transportation

Erection

St. Lawrence Erectors

Products and Services

Fabrication of the steel bridge superstructure (4,550 tons)

Longest girder: 118 ft. (36.3 m)

Heaviest girder: 94,000 lbs.

Launched-girder erection

Goodco Z-Tech:
40 pot bearings

8 laminated elastomeric bearings

2 LG-3 type modular expansion joints

2 LG-4 type modular expansion joints

1 HSS type expansion joint (Series 1000)

Description

Construction of a bridge over the Gilbert River and 34th Street in Notre-Dame-des-Pins, Quebec, in the scope of the Highway 73 extension project.

 

 

Features

The structure of the Gilbert River bridge is erected 171 ft. (52 meters) high.
Girders were erected using the launching method.

canambridges.com

RELATED PROJECTSAll projects

To top