Quincy/Weymouth, MA, United States
1,300-ft (38-meters) highway bridge (7 spans)
2013-2015
Expected in 2018
Joint venture formed by J.F. White and Skanska
Parsons
Massachusetts Department of Transportation
Fabrication of the bridge superstructure (3,345 tons)
80 girders for the bridge approach in addition to through trusses for the 324-feet (99-meters) vertical lift section
Longest girder: 125 feet (38 meters)
Heaviest girder: 63 tons
Replacement of the Fore River Bridge that connects the cities of Quincy and Weymouth in Massachusetts.
canambridges.com