Sheet Harbour, NS, Canada
600-ft. (183-m) highway bridge (3 spans)
2015
2015
Dexter Construction Company Ltd.
Harbourside Engineering Consultants
Nova Scotia Transportation
Fabrication of the steel bridge superstructure (715 tons)
10 box girders
Painting
Launched-girder erection
Goodco Z-Tech:
8 pot bearings
Replacement of the East River Bridge on Highway 7 in Sheet Harbour, NS and upgrade of the bridge approaches. The existing steel arch bridge was opened in 1956.
canambridges.com