Burlington/Hamilton, ON, Canada
Highway bridge, 2.5 km (8,202 ft.) long
2008
Concreate USL Ltd
McCormick Rankin Corporation
Ontario Ministry of Transportation
Goodco Z-Tech
4 LG-6 modular joints (86 m/282 ft. total)
2 LG-4 modular joints (43 m/141 ft. total)
Replacement of six expansion joints on the bridge structure over Burlington Bay near Niagara.
Extremely complex joints with a significant amount of complete penetration welding. All joints were delivered as a single 21.5 meter-long (70.5-ft.) section by Canam Group’s truck fleet.
canambridges.com