Longueuil/Boucherville, QC, Canada
3 bridges on a bicycle path
2017
2017
EBC
CIMA+
Ville de Boucherville
Fabrication of the steel bridges superstructure composed of W-shape rolled form) (867 tons)
1140 slab supports (43 tons)
961 ft. of expansion joints with compression seals
Construction of three bridges on a 1.8-km bicycle path between the Louis-Hippolyte-La Fontaine Tunnel in Longueuil and the Boucherville Rowing Club in Québec as part of the Oka – Mont-St-Hilaire bicycle link project.
canambridges.com