93 Fast 14 (Highway I-93)

Print

Project Details

Location

Medford, MA, USA

Type of Structure

14 overpasses ranging between 134 ft. and 325 ft. (40.8 and 99 m) in length

Year(s) of Manufacture

2010

General Contractor

J.F. White/Kiewit

Engineering Firm

Gill Engineering Associates, Inc.

Owner

Massachussetts Department of Transportation

Products and Services

Fabrication of the steel bridge superstructure (2,500 tons)
504 girders
Longest girder: 325 feet (99 meters)

Description

Replacement of 14 overpasses along Interstate 93 in Medford, Massachusetts.

Features

An average of 25 to 35 girders were fabricated each week for this project (Accelerated Bridge Construction).

 