The Hastings movable bridge, located in the Village of Hastings, Ontario, Canada, needed major repairs. The structure is a 2,200 square foot (204 square meter) swing bridge. In 2016, Canam-Bridges replaced its 83.8 foot (25.6 meters) long by 26.7 foot (8.2 meters) wide superstructure. Hastings Swing Bridge under construction Challenges The weight of the new bridge superstructure and deck had to be low enough for the existing mechanical and electrical elements in the substructure to support its movement. Demolition…
This 246-foot-long (75 meters) pedestrian bridge was erected over the Ottawa Airport Parkway to link the Hunt Club community and the Southeast Transitway in Ottawa, Ontario. The structure is a cable-stayed bridge with two asymmetrical spans, one of 170 feet (52 meters) in length and the other 76 feet (23 meters) in length. The deck is composed of three orthotropic steel deck panels. The bridge opened to pedestrians and cyclists in November 2014. Photo: Parsons –…
Orthotropic steel deck is being used more and more in Canada, and the reasons for choosing this solution are many. While professionals opt for this method mainly because of its cost-saving advantages, the benefits extend even further. Orthotropic deck is composed of a steel plate that’s covered by a shop-installed roadway surface. The bottom of the plate is simply stiffened using components that are sized primarily according to the traffic loads and the number of…