Credit: INFC

Press Releases and News

May 10, 2013

Largest Contract Ever at Goodco Z-Tech

Largest Contract Ever at Goodco Z-Tech

Goodco Z-Tech recently landed a contract to fabricate multiple expansion joints for the Northeast Anthony Henday Drive leg of the Edmonton Ring Road project that’s currently underway in Alberta. Architectural rendering of the Northeast Anthony Henday Drive project The company will supply approximately 1,000 meters of finger expansion joints and Series…

Read more

April 26, 2013

Structal-Bridges Lands Two Major Contracts in Newfoundland and Labrador and Massachussetts

Structal-Bridges Lands Two Major Contracts in Newfoundland and Labrador and Massachussetts

(SAINT-GEORGES, QC) – Structal-Bridges, a division of Canam Group Inc. (TSX: CAM), has secured two large contracts totaling close to $60M for the fabrication of the steel structures that will replace the Sir Ambrose Shea Lift Bridge in Placentia, located in the province of Newfoundland and Labrador, Canada,…

Read more

March 27, 2013

Acrow Corporation and Structal-Bridges Establish Agreement of Collaboration and Partnership

Acrow Corporation and Structal-Bridges Establish Agreement of Collaboration and Partnership

Structal-Bridges and Acrow Corporation, a leading international bridge engineering and supply company based in Parsippany, New Jersey, United States, have signed an agreement to collaborate and cooperate on the sales and marketing for the products that each of the companies manufacture. Robin Lapointe, Vice President, Structal-Bridges, stated, “Our partnership…

Read more

January 29, 2013

Memorial Bridge Southbound Span in Place

Memorial Bridge Southbound Span in Place

The first section of the Memorial Bridge that links Kittery, Maine, and Portsmouth, New Hampshire, was recently erected on the piers of the new bridge. The immense steel structure, which measures 300 ft. (91.4 m) long and weighs 650 tons, forms the southbound span. Photo: NHDOT The first section of the…

Read more

December 13, 2012

Canam Group Inc. Lands Multiple Contracts Totaling Close to $55M

Canam Group Inc. Lands Multiple Contracts Totaling Close to $55M

(BOUCHERVILLE, QC) Canam Group Inc. (TSX: CAM) today announced that it recently added close to $55M in contracts to its backlog of orders for various building, structural steel and bridge projects. Bridges in Wisconsin and Massachusetts Structal-Bridges concluded agreements totaling more than $26M for the fabrication of two bridges in…

Read more

September 27, 2012

Des Laurentides Interchange: Watch a Video Showing the Erection of Box Girders

Des Laurentides Interchange: Watch a Video Showing the Erection of Box Girders

A video presenting the field erection of box girders at the Des Laurentides Interchange in Montreal, Quebec, is now available under the Projects tab, Video, on the Structal-Bridges website. It was filmed by G.T.S. (Les Grands Travaux Soter Inc.), the general contractor in charge of the project. Length: 9 min. 56…

Read more

September 19, 2012

Tour the Dominion Bridge via a 360° Interactive Panoramic Photo

Tour the Dominion Bridge via a 360° Interactive Panoramic Photo

Thanks to the latest 360-degree photo technology, you can now go on a virtual tour of the Dominion Bridge, located between Lévis and Quebec City in the province of Quebec, and view the structure in minute detail. In 2011, Structal-Bridges supplied 3,500 tons of metalized structural steel components as…

Read more

August 7, 2012

Structal-Bridges Lands Three Contracts in Quebec and Alberta

Structal-Bridges Lands Three Contracts in Quebec and Alberta

(QUEBEC CITY, QC) – Structal-Bridges, a business unit of Canam Group Inc. (TSX: CAM), today announced that it has secured three contracts totaling close to $50M for the fabrication of the steel structures of bridges that will be erected in Notre-Dame-des-Pins and Lévis, in Quebec, and in Edmonton,…

Read more

July 13, 2012

North Channel Bridge: An Innovative Girder Erection Method Signed Structal-Bridges

North Channel Bridge: An Innovative Girder Erection Method Signed Structal-Bridges

Structal-Bridges began delivering box girders in the scope of the North Channel Bridge Replacement Project in Cornwall, Ontario, in mid-May. The erection of the girders, which was also entrusted to Structal-Bridges, is being executed using the launched-girder erection technique that requires the use of a steel launching nose: a lightweight…

Read more

June 19, 2012

Goodco Z-Tech Publishes a Report on Fatigue Tests Performed on its Modular Joints

Goodco Z-Tech Publishes a Report on Fatigue Tests Performed on its Modular Joints

Goodco Z-Tech a Canadian leader in the design and manufacture of structural bearings and expansion joints, published a report titled ‘’ Fatigue testing of Goodco Z-Tech single support bar modular bridge expansion joint with welded stirrups’’ on its website. This executive report is a summary of an exhaustive and comprehensive…

Read more

June 1, 2012

Structal-Bridges Completes Deliveries for the Route 1 Gateway Project in New Brunswick

Structal-Bridges Completes Deliveries for the Route 1 Gateway Project in New Brunswick

Structal-Bridges recently completed the delivery of components for the construction of the Musquash Bridge, one of several structures being built in the scope of the Route 1 Gateway Project in New Brunswick. Structal-Bridges was mandated by Dexter Construction Company Ltd. to fabricate 11 steel…

Read more

May 25, 2012

Autoroute 5 Extension Project: A Second Contract for Structal-Bridges

Autoroute 5 Extension Project: A Second Contract for Structal-Bridges

Structal-Bridges recently concluded an agreement to fabricate the steel components for a total of four structures that are being built in the scope of the Autoroute 5 extension project in Quebec’s Outaouais region. This is the second contract obtained by Structal-Bridges from general contractor Couillard Construction Ltd. The four structures, which…

Read more

To top